See Real Bid Addendum Preflight Reports Before You Upload
Every report below was generated directly by our deterministic engine on real public municipal tender workbooks (using simulated contractor unit rates to illustrate real-world addendum traps). Inspect exactly what the free preview shows vs. what unlocks in the $39 one-time delivery bundle.
City of San Marcos IFB 223-253 — Full Audit Report
Post-Addendum #2 revised bid schedule with 4 Bid Options, locked $136,000 owner contingency, and simulated contractor faults.
- Item #16 collision price swap ($34,000 error from reused item number)
- Broken Additive Alternate 3 SUM formula silently dropping active row F119 ($22,125 underbid)
- 4 unpriced active bid items + deleted Alternate 2 shade tree line
- Addendum #1 & #2 acknowledgment verification across 3 PDF documents
City of San Marcos IFB 223-253 — Free Risk Preview Mode
Shows what estimators see for free before deciding to unlock the $39 full delivery bundle.
- High-risk BLOCKED verdict banner with exact blocker/warning counts
- Quantified dollar exposure and Independent Decimal Group Totals
- Cell coordinates, formulas, and lossless Excel write-back unlocked after checkout
Town of Canmore CAP-7301 — Full Audit Report
Addendum #1 revised unit-price schedule featuring red strikethrough deletions, shifted item numbering, and a hidden safety-plan deliverable.
- Red strikethrough deleted item still priced by contractor
- Post-addendum renumbering price swap across shifted rows
- Hardcoded manual subtotal diverging from independent Decimal sum
- Mandatory bid-time Sample Project Specific Safety Plan caught from Addendum PDF
Kitsap County IFB 2026-016 — Full Audit Report
Addendum #2 unit-change bid schedule with Lump Sum to Tonnage explosion, deleted Item #6, external Excel workbook links, and 3-page Q&A PDF.
- Unit change LS → TON on Item 12C / 13 blocking catastrophic rate carry-over
- Item 12B unit change to CY and deleted Item #6 cross-checked against Q&A PDF
- External workbook link taint detected across pricing formulas
- Mandatory committed work window deliverable extracted with page-level quote
Aberdeen JUL560028 — 21-Sheet BoQ Full Audit Report
21-worksheet Bill of Quantities verifying split excavation depth items, multi-sheet summary totals, and a withdrawn ACSSIS discount line.
- 21-sheet sparse OOXML scan with £ currency & multi-section group totals
- Split trench-depth item rate swap flagged for estimator review
- Withdrawn summary-sheet ACSSIS incentive/discount line detected