Catch Addendum Bid Schedule Traps Before You Submit

Upload your latest Owner Bid Schedule, your filled Excel takeoff, and Addendum PDFs. Get a free high-risk summary preview in seconds — then unlock the full line-by-line audit workbook, standalone HTML report, and formula-preserving Owner XLSX write-back for $39 / bid pack. No signup required.

Local Deterministic Default: Zero external AI transfer unless you explicitly opt in below. We never train models on your files. Auto-Purged: Isolated workspace deleted automatically after 24h (or 1-click delete anytime). Fail-Closed Math: Penny-exact Decimal & OOXML formula verification.
1. Upload Bid PackageLatest Owner XLSX (required), Contractor XLSX, prior versions, and Addendum PDFs.
2. Free Risk PreviewSee Hard Blockers, Warnings, Quantified Dollar Risk, and Independent Group Totals free.
3. Unlock Full Delivery ($39)One-time Stripe checkout unlocks exact cell coordinates, Audit XLSX, and lossless Owner XLSX.

Run a Preflight Audit

Authoritative post-addendum owner Excel schedule (max 25 MB).
Optional. Upload to verify your rates, totals, and generate safe write-back.
Optional. Detects revised quantities, unit swaps, and renumbered items.
Optional. Cross-checks migrated rates against prior submission.
Up to 20 PDFs. Extracts acknowledgment rules, deleted items, unit changes, and mandatory bid-time deliverables.

Estimator Guides & Real Addendum Failure Modes

Compare Revised Bid Schedule Excel After an Addendum — Without Breaking Owner Formulas

Automatically compare a revised post-addendum owner bid schedule Excel against your filled draft. Catch reused item numbers, shifted rows, broken SUM formulas, and export a lossless owner XLSX.

Read guide & public bid example →

Construction Bid Addendum Checklist & Automated Bid-Day Preflight Audit

Run a deterministic final bid-day addendum audit across your Excel bid schedule and Addendum PDFs. Verify addendum acknowledgments, hidden bid-time deliverables, calendar conflicts, and totals.

Read guide & public bid example →

Catch Strikethrough Deletions & Renumbered Items in Tender Pricing Forms

Detect Excel strikethrough deleted bid items, blanked rows, and post-addendum renumbering price swaps automatically before submitting your construction tender.

Read guide & public bid example →

Verify Unit-Price Bid Form Formulas, Units & External Links Before Bid Day

Audit Excel unit-price bid formulas before submission. Catch unit changes (LS to TON, CY to M3), external workbook links, broken SUM ranges, circular references, and penny rounding drift.

Read guide & public bid example →

Multi-Sheet Revised BoQ & Schedule of Rates Revision Checker (UK, CA, AU, US)

Audit multi-sheet UK, Canadian, and Australian Bills of Quantities (BoQ) and Schedules of Rates after tender addenda. Supports £/$/€ currencies, split depth items, and multi-tab summaries.

Read guide & public bid example →