Bid-Day Compliance & Preflight

Construction Bid Addendum Checklist & Automated Bid-Day Preflight Audit

Most bid disqualifications are not pricing strategy failures — they are missed Addendum #2 acknowledgments, overlooked bid-time safety attachments buried in a Q&A PDF, or an unpriced row left behind after last-minute edits. Run a complete bid-day preflight before sealing your envelope.

Transparent Pricing: Free Risk Preview → $39 one-time per bid pack (no subscription). Zero Model Training: Local deterministic engine by default; files auto-delete in 24h. Lossless Export: Keeps owner sheet protection, locked contingencies & Excel formulas intact.

Public Tender Example: Town of Canmore CAP-7301 & Kitsap County IFB 2026-016

Demonstrated on public municipal tender packs (Canmore CAP-7301 and Kitsap IFB 2026-016) with simulated unit prices.
Addendum Trap CaughtWhat Happened in the Spreadsheet / PDFQuantified Risk or Outcome
Hidden Bid-Time Deliverable Canmore Addendum #1 required a Sample Project Specific Safety Plan submitted WITH the bid (while the full plan was post-award). Caught as a bid-time compliance requirement with exact PDF page quote
Missing Addendum Acknowledgment Kitsap & San Marcos bid forms require explicit acknowledgment of every issued addendum number (#1, #2, etc.). Cross-checks PDF addendum numbers against your confirmed signed list
Calendar Date / Weekday Conflict Addendum closing notices occasionally publish impossible dates (e.g., 'Thursday, May 14' when May 14 is a Friday). Deterministic calendar check flags date/weekday contradictions automatically
Open Full Interactive HTML Sample Report →

What Deterministic Checks Run Automatically

  • Extracts addendum numbering, mandatory revised-schedule notices, acknowledgment requirements, deleted items, and unit changes from every uploaded PDF.
  • Separates mandatory bid-time deliverables from post-award contractor submittals so you see real submission risks without noise.
  • Audits 100% of active Excel bid schedule rows for unpriced items, invalid numeric strings, external links, and broken subtotals.
  • Generates a clean Audit XLSX and standalone HTML sign-off report for estimator and principal review.

Scope, Privacy & Honest Limitations

  • Deterministic PDF extraction covers standard text-selectable PDFs up to 100 pages per file (exceeding limits triggers an explicit BLOCKER rather than partial silence).
  • Optional external AI PDF Q&A extraction is strictly opt-in (off by default) and quote-grounded against the source page.
  • Does not evaluate bonding capacity, contractor licensing, or legal contract terms outside the uploaded bid schedule and addendum PDFs.

Ready to Audit Your Bid Package Before Opening?

No login, no sales call, no subscription. Upload your latest owner schedule and see your free risk verdict in seconds; unlock exact cell coordinates, Audit XLSX, and lossless revised Owner XLSX for $39 one-time.

Upload Bid Package for Free Preview →

Frequently Asked Questions

How does the tool distinguish bid-time attachments from post-award requirements?

Our deterministic parser analyzes the local sentence context around deliverable phrases and filters out post-award clauses ('prior to construction', 'after award') and Q&A questions so only actionable submission requirements surface as warnings.

What happens if an addendum PDF is a scanned image?

Fail-closed protection: scanned PDFs with zero extractable text immediately trigger an ADDENDUM_PDF_UNREADABLE BLOCKER so a scanned addendum is never silently treated as clear.

Can I confirm which addenda I already signed before running the check?

Yes. Enter your already-signed addendum numbers (e.g. '1, 2') and included compliance attachments in the upload form, and the engine verifies whether any unconfirmed addendum remains.

How much does a full bid-day preflight audit cost?

Previewing your risk verdict, blocker counts, quantified dollar risk, and independent group totals is free. Unlocking the full Audit XLSX, HTML report, and lossless revised Owner XLSX is $39 one-time per bid pack.

More Construction Bid Preflight Guides