Bid Addendum Preflight Report — Canmore CAP 7301 (AB) — Red Strikethrough & Renumbering Audit

Authoritative Latest Schedule: owner_04_rev1_pricing_form.xlsx · Contractor File: contractor_rev1_with_strike_fault.xlsx · Full Deterministic Audit
Sample Data Notice: Built from the official public solicitation files with simulated contractor unit rates and controlled benchmark faults injected for verification.
Hard Blockers
4
Warnings
3
Quantified Risk
$4,030.00
Rows Audited
77
Safe Cells Written
74

Findings & Hard-Gate Checks

BLOCKER STRUCK_THROUGH_ROW_PRICED 2026-06-19!E109 Risk: $630.00

Strikethrough-deleted row #10 (Pedestrian Crossings) is still priced

Owner latest schedule marks 2026-06-19!Row 109 with strikethrough formatting (retaining quantity 5.25 l.m), but contractor entered rate=120, amount=630 (inflating total by 630.00).

Action: Remove rate, formulas, and extended amount from struck-through row and recalculate subtotal.

BLOCKER RENUMBERED_ITEM_PRICE_SWAP 2026-06-19!E110 Risk: $1,700.00

Renumbered item #10 (Pedestrian Crossing Signs c/w Base) has swapped unit rate

Row 110 was previously item #11 priced at 1500, but in revised schedule #10 contractor entered 650 (matching an adjacent item's prior rate after renumbering).

Action: Restore semantic item rate 1500 or confirm deliberate repricing.

BLOCKER RENUMBERED_ITEM_PRICE_SWAP 2026-06-19!E111 Risk: $1,700.00

Renumbered item #11 (Relocate Existing Signage) has swapped unit rate

Row 111 was previously item #12 priced at 650, but in revised schedule #11 contractor entered 1500 (matching an adjacent item's prior rate after renumbering).

Action: Restore semantic item rate 650 or confirm deliberate repricing.

INFO ITEM_DELETED_IN_ADDENDUM 2026-06-19!R109

Prior item #10 (Pedestrian Crossings) removed in latest schedule

Removed from Site 7 (previously 5.25 l.m). Ensure prior cost is excluded from totals.

Action: Confirm removal and verify supplier quotes/subtotals exclude this item.

BLOCKER MANUAL_SUBTOTAL_MISMATCH 2026-06-19!F112 Risk: $630.00

Manual subtotal at 2026-06-19!F112 does not match active rows

Subtotal: 22791 reports 22,791.00, but independent sum of active lines is 22,161.00 (delta +630.00).

Action: Update 2026-06-19!F112 to 22,161.00.

WARNING NO_SUBTOTAL_FORMULAS contractor_rev1_with_strike_fault.xlsx

Schedule has no Excel formulas on subtotal/total rows

All subtotal/total cells are static values or blank; verify manual arithmetic against independent Decimal totals.

Action: Cross-check every manually entered subtotal against the Audit Totals table.

WARNING PDF_HIDDEN_DELIVERABLE owner_02_addendum_01.pdf:p.1

Required deliverable / compliance item: Safety Plan

Found in owner_02_addendum_01.pdf p.1: "D Item No. Questions 1. Question: Per RFQ section 4.2.1.5 is a Project Specific Safety Plan an acceptable alternative to COR certification requirements?"

Action: Include this required document/statement with final bid submission.

WARNING PDF_HIDDEN_DELIVERABLE owner_02_addendum_01.pdf:p.1

Required deliverable / compliance item: COR/SECOR

Found in owner_02_addendum_01.pdf p.1: "e Project Specific Safety Plan will be evaluated under Category 4 in lieu of COR/SECOR Certified. If successful, the proponent shall submit a Project Specific Saf"

Action: Include this required document/statement with final bid submission.

Independent Decimal Group Totals

SheetGroupActive ItemsPricedIndependent TotalReported TotalStatus
2026-06-19 Site 1 13 13 / 13 $21,616.00 — OK
2026-06-19 Site 2 7 7 / 7 $6,035.40 — OK
2026-06-19 Site 3 12 12 / 12 $31,248.00 — OK
2026-06-19 Site 4 6 6 / 6 $13,728.20 — OK
2026-06-19 Site 5 14 14 / 14 $270,396.20 — OK
2026-06-19 Site 6 13 13 / 13 $28,283.90 — OK
2026-06-19 Site 7 11 11 / 11 $22,161.00 $22,791.00 MISMATCH

Complete Line-by-Line Audit (77 total rows · 3 flagged / changed)

CellGroupItem#Description Latest Qty/UnitPrior Qty/Unit Contractor RateStatusAudit Note
2026-06-19!R4 Site 1 1 General Requirements 1 LS 1 LS $54.00 EXACT_SAFE Matched cleanly.
2026-06-19!R5 Site 1 2 Traffic Control and Accomodation 1 LS 1 LS $55.00 EXACT_SAFE Matched cleanly.
2026-06-19!R6 Site 1 3 Erosion and Sediment Control 1 LS 1 LS $56.00 EXACT_SAFE Matched cleanly.
2026-06-19!R7 Site 1 4 Concrete Sidewalk Removal 10 m2 10 m2 $57.00 EXACT_SAFE Matched cleanly.
2026-06-19!R8 Site 1 5 Curb & Gutter Removal 12 l.m 12 l.m $58.00 EXACT_SAFE Matched cleanly.
2026-06-19!R9 Site 1 6 Topsoil Stripping 120 m2 120 m2 $59.00 EXACT_SAFE Matched cleanly.
2026-06-19!R10 Site 1 7 Concrete Sidewalk Installation 120 m2 120 m2 $60.00 EXACT_SAFE Matched cleanly.
2026-06-19!R11 Site 1 8 Concrete Curb and Gutter 76 l.m 76 l.m $61.00 EXACT_SAFE Matched cleanly.
2026-06-19!R12 Site 1 9 Concrete Pedestrian Ramp c/w Tactile Plates 2 EA 2 EA $62.00 EXACT_SAFE Matched cleanly.
2026-06-19!R13 Site 1 10 Pedestrian Crossings 12 l.m 12 l.m $63.00 EXACT_SAFE Matched cleanly.
2026-06-19!R14 Site 1 11 Pedestrian Crossing Signs c/w Base 2 EA 2 EA $64.00 EXACT_SAFE Matched cleanly.
2026-06-19!R15 Site 1 12 Relocate Existing Signage 3 EA 3 EA $65.00 EXACT_SAFE Matched cleanly.
2026-06-19!R16 Site 1 13 Shift Garbage Bins and Concrete Pad 1 LS 1 LS $66.00 EXACT_SAFE Matched cleanly.
2026-06-19!R22 Site 2 1 General Requirements 1 LS 1 LS $72.00 EXACT_SAFE Matched cleanly.
2026-06-19!R23 Site 2 2 Traffic Control and Accomodation 1 LS 1 LS $73.00 EXACT_SAFE Matched cleanly.
2026-06-19!R24 Site 2 3 Erosion and Sediment Control 1 LS 1 LS $74.00 EXACT_SAFE Matched cleanly.
2026-06-19!R25 Site 2 4 Topsoil Stripping 33 m2 33 m2 $75.00 EXACT_SAFE Matched cleanly.
2026-06-19!R26 Site 2 5 Concrete Sidewalk Installation 10.4 m2 10.4 m2 $76.00 EXACT_SAFE Matched cleanly.
2026-06-19!R27 Site 2 6 Concrete Bus Pad 23 m2 23 m2 $77.00 EXACT_SAFE Matched cleanly.
2026-06-19!R28 Site 2 7 Imported Fill 10 m3 10 m3 $78.00 EXACT_SAFE Matched cleanly.
2026-06-19!R34 Site 3 1 General Requirements 1 LS 1 LS $84.00 EXACT_SAFE Matched cleanly.
2026-06-19!R35 Site 3 2 Traffic Control and Accomodation 1 LS 1 LS $85.00 EXACT_SAFE Matched cleanly.
2026-06-19!R36 Site 3 3 Erosion and Sediment Control 1 LS 1 LS $86.00 EXACT_SAFE Matched cleanly.
2026-06-19!R37 Site 3 4 Topsoil Stripping 182 m2 182 m2 $87.00 EXACT_SAFE Matched cleanly.
2026-06-19!R38 Site 3 5 Concrete Sidewalk Installation 50 m2 50 m2 $88.00 EXACT_SAFE Matched cleanly.
2026-06-19!R39 Site 3 6 Concrete Bus Pad 60 m2 60 m2 $89.00 EXACT_SAFE Matched cleanly.
2026-06-19!R40 Site 3 7 Concrete Curb and Gutter 46 l.m 46 l.m $90.00 EXACT_SAFE Matched cleanly.
2026-06-19!R41 Site 3 8 Supply and Install Roam Bus Stop Signage 1 EA 1 EA $91.00 EXACT_SAFE Matched cleanly.
2026-06-19!R42 Site 3 9 Supply and Install Signage 2 EA 2 EA $92.00 EXACT_SAFE Matched cleanly.
2026-06-19!R43 Site 3 10 Relocate Existing Signage 1 EA 1 EA $93.00 EXACT_SAFE Matched cleanly.
2026-06-19!R44 Site 3 11 Install Garbage Bin and Concrete Pad 1 LS 1 LS $94.00 EXACT_SAFE Matched cleanly.
2026-06-19!R45 Site 3 12 Extend SD 450 CSP Culvert 8.6 l.m 8.6 l.m $95.00 EXACT_SAFE Matched cleanly.
2026-06-19!R51 Site 4 1 General Requirements 1 LS 1 LS $101.00 EXACT_SAFE Matched cleanly.
2026-06-19!R52 Site 4 2 Traffic Control and Accomodation 1 LS 1 LS $102.00 EXACT_SAFE Matched cleanly.
2026-06-19!R53 Site 4 3 Erosion and Sediment Control 1 LS 1 LS $103.00 EXACT_SAFE Matched cleanly.
2026-06-19!R54 Site 4 4 Remove and Dispose of Existing Asphalt 72.3 m2 72.3 m2 $104.00 EXACT_SAFE Matched cleanly.
2026-06-19!R55 Site 4 5 Concrete Sidewalk Installation 33 m2 33 m2 $105.00 EXACT_SAFE Matched cleanly.
2026-06-19!R56 Site 4 6 Concrete Curb and Gutter 23 l.m 23 l.m $106.00 EXACT_SAFE Matched cleanly.
2026-06-19!R62 Site 5 1 General Requirements 1 LS 1 LS $112.00 EXACT_SAFE Matched cleanly.
2026-06-19!R63 Site 5 2 Traffic Control and Accomodation 1 LS 1 LS $113.00 EXACT_SAFE Matched cleanly.
2026-06-19!R64 Site 5 3 Erosion and Sediment Control 1 LS 1 LS $114.00 EXACT_SAFE Matched cleanly.
2026-06-19!R65 Site 5 4 Concrete Sidewalk Removal 9 m2 9 m2 $115.00 EXACT_SAFE Matched cleanly.
2026-06-19!R66 Site 5 5 Curb & Gutter Removal 10.2 l.m 10.2 l.m $116.00 EXACT_SAFE Matched cleanly.
2026-06-19!R67 Site 5 6 Full Depth Milling (50mm) of Existing Asphalt (PROVISIONAL) 700 m2 700 m2 $117.00 EXACT_SAFE Matched cleanly.
2026-06-19!R68 Site 5 7 Tack Coat (PROVISIONAL) 600 m2 600 m2 $118.00 EXACT_SAFE Matched cleanly.
2026-06-19!R69 Site 5 8 Asphalt Concrete Pavement Overlay - Calgary Type "B" Mix (PG 64-34), 50mm Compacted Thickness (PROVISIONAL) 600 m2 600 m2 $119.00 EXACT_SAFE Matched cleanly.
2026-06-19!R70 Site 5 9 Concrete Bus Bay (PROVISIONAL) 184 m2 184 m2 $120.00 EXACT_SAFE Matched cleanly.
2026-06-19!R71 Site 5 10 Concrete Bus Pad 102 m2 102 m2 $121.00 EXACT_SAFE Matched cleanly.
2026-06-19!R72 Site 5 11 Concrete Curb and Gutter 60 l.m 60 l.m $122.00 EXACT_SAFE Matched cleanly.
2026-06-19!R73 Site 5 12 Concrete Pedestrian Ramp c/w Tactile Plates 1 EA 1 EA $123.00 EXACT_SAFE Matched cleanly.
2026-06-19!R74 Site 5 13 Supply and Install Street Light Foundation and Rod 1 EA 1 EA $124.00 EXACT_SAFE Matched cleanly.
2026-06-19!R75 Site 5 14 Supply and Install Street Light Conduit 14 l.m 14 l.m $125.00 EXACT_SAFE Matched cleanly.
2026-06-19!R82 Site 6 1 General Requirements 1 LS 1 LS $132.00 EXACT_SAFE Matched cleanly.
2026-06-19!R83 Site 6 2 Traffic Control and Accomodation 1 LS 1 LS $133.00 EXACT_SAFE Matched cleanly.
2026-06-19!R84 Site 6 3 Erosion and Sediment Control 1 LS 1 LS $134.00 EXACT_SAFE Matched cleanly.
2026-06-19!R85 Site 6 4 Remove and Dispose Existing Landscape Boulders 1 LS 1 LS $135.00 EXACT_SAFE Matched cleanly.
2026-06-19!R86 Site 6 5 Concrete Sidewalk Removal 9 m2 9 m2 $136.00 EXACT_SAFE Matched cleanly.
2026-06-19!R87 Site 6 6 Curb & Gutter Removal 5.7 l.m 5.7 l.m $137.00 EXACT_SAFE Matched cleanly.
2026-06-19!R88 Site 6 7 Concrete Sidewalk Installation 162 m2 162 m2 $138.00 EXACT_SAFE Matched cleanly.
2026-06-19!R89 Site 6 8 Install 3.0m Wide Precast Median - 2 Cap Units, 4 Middle Units (Supplied by TOC) 1 EA 1 EA $139.00 EXACT_SAFE Matched cleanly.
2026-06-19!R90 Site 6 9 Concrete Pedestrian Ramp c/w Tactile Plates 2 EA 2 EA $140.00 EXACT_SAFE Matched cleanly.
2026-06-19!R91 Site 6 10 Pedestrian Crossing 15 l.m 15 l.m $141.00 EXACT_SAFE Matched cleanly.
2026-06-19!R92 Site 6 11 Pedestrian Crossing Signs c/w Base 4 EA 4 EA $142.00 EXACT_SAFE Matched cleanly.
2026-06-19!R93 Site 6 12 Relocate Existing Signage 1 EA 1 EA $143.00 EXACT_SAFE Matched cleanly.
2026-06-19!R94 Site 6 13 Supply and Install Signage 1 EA 1 EA $144.00 EXACT_SAFE Matched cleanly.
2026-06-19!R100 Site 7 1 General Requirements 1 LS 1 LS $150.00 EXACT_SAFE Matched cleanly.
2026-06-19!R101 Site 7 2 Traffic Control and Accomodation 1 LS 1 LS $151.00 EXACT_SAFE Matched cleanly.
2026-06-19!R102 Site 7 3 Erosion and Sediment Control 1 LS 1 LS $152.00 EXACT_SAFE Matched cleanly.
2026-06-19!R103 Site 7 4 Concrete Sidewalk Removal 10 m2 10 m2 $153.00 EXACT_SAFE Matched cleanly.
2026-06-19!R104 Site 7 5 Curb & Gutter Removal 15 l.m 15 l.m $154.00 EXACT_SAFE Matched cleanly.
2026-06-19!R105 Site 7 6 Topsoil Stripping 18 m2 18 m2 $155.00 EXACT_SAFE Matched cleanly.
2026-06-19!R106 Site 7 7 Concrete Sidewalk Installation 57 m2 57 m2 $156.00 EXACT_SAFE Matched cleanly.
2026-06-19!R107 Site 7 8 Concrete Curb and Gutter 10 l.m 10 l.m $157.00 EXACT_SAFE Matched cleanly.
2026-06-19!R108 Site 7 9 Concrete Pedestrian Ramp c/w Tactile Plates 2 EA 2 EA $158.00 EXACT_SAFE Matched cleanly.
2026-06-19!R109 Site 7 10 Pedestrian Crossings 5.25 l.m 5.25 l.m $120.00 STRUCK_THROUGH_DELETED Owner struck through this row; excluded from active bidding.
2026-06-19!R110 Site 7 10 Pedestrian Crossing Signs c/w Base 2 EA 2 EA $650.00 ITEM_COLLISION_PRICE_SWAP Renumbered #11 -> #10; rate appears swapped.
2026-06-19!R111 Site 7 11 Relocate Existing Signage 2 EA 2 EA $1,500.00 ITEM_COLLISION_PRICE_SWAP Renumbered #12 -> #11; rate appears swapped.

Addendum PDF & Deliverable Evidence (2 signals)

PDF FilePageAdd.#LevelExtracted Requirement & Exact Source Quote
owner_02_addendum_01.pdf p.1 1 WARNING Required deliverable / compliance item: Safety Plan
D Item No. Questions 1. Question: Per RFQ section 4.2.1.5 is a Project Specific Safety Plan an acceptable alternative to COR certification requirements?
owner_02_addendum_01.pdf p.1 1 WARNING Required deliverable / compliance item: COR/SECOR
e Project Specific Safety Plan will be evaluated under Category 4 in lieu of COR/SECOR Certified. If successful, the proponent shall submit a Project Specific Saf